Managing infrastructure project delivery risks in the new environment requires an appreciation of current developments. The delivery of these projects need to consider the changing risk landscape and how to approach it. Some governments have been planning– or are otherwise in – phases of reopening the economy. Whether it beto address another potential wave, or to be better prepared for future similar events, risks mitigants in infrastructure project delivery need to be considered and are likely here to stay.

Design, Construction, and Operations Considerations

Will technical output specifications for infrastructure projects begin to shift ‘pandemic prevention and control risks’ to designers?

It isn’t hard to imagine the built environment reshapingin order to sustainthe spread offuture viruses. Technologies arealready advancing to facilitate more hands-free interaction with this infrastructure. This use of voice activated, automated, or personal cell phone control technology will become more of the norm when interacting with built infrastructure (elevators, doors, restrooms, temperature controls, and fare collection equipment).

Other design solutions may include morescreening areas, longer trains and transit platforms, andbetterair movement within spaces. Owners also need to help determine how prescriptive these design considerations need to be, orcansimply transfer the ‘pandemic prevention and control risks’ to designers.

What are some of the construction-related risks (COVID-19 or similar) to be considered?

The risks and impacts of managing projects on construction sites are asset type dependent. Risks for construction workers are more material in confined spaces, whereas therisk may only be on select types of activitieson long linear highway projects. However, on major transit projects with tunnels and underground stations, there would be more of an impairment to progress and efficiency.

A number of these site related risks may not require costly mitigation measuresassuming there is no outbreak on site. These risks can likely be addressed at the local site-level by enhancing health andsafety training, toolbox talks, cleaning of equipment and tools, placement of hand sanitizers, and additional Personal Protective Equipment (PPE) where physical distancing activities cannot be achieved.

A more material risk may arise from supply chain disruptions. As the economy reopens, updated protocols will be required at facilities to ensure worker safety and productivity.In addition, ifmaterial is sourced outside of the region, timely supply of pre-fabricated material may be impacted by the pandemic response from that local government. Contractors need to consider what contractual protections they have and document the issues they face as early as possible.

What risks would infrastructure owners, or asset maintainers and operators need to consider?

This depends on the infrastructure asset class and whether the asset is already designed with features to address COVID-like diseases. Ona smaller scale, maintenance of vertical infrastructurewill likely require more frequent cleaning of restrooms, elevators, and doors.

A bigger question is whether a society being more receptive to the work-from-home model will see ripple effectsto travel patterns. How couldsuch changes impact transportation?Would more, longer trains at a higher frequency run to avoid overcrowding, thereby leading to higher maintenance and operation costs? Would people return to personal single occupancy vehicles to avoid crowded transit hubs, and add a greater burden on aging roadways? Authorities and operators, particularly those with fixed priced maintenance contracts, will have to monitor thistravel data closely during recovery.

Pricing and Scheduling Considerations

Addressingthisiscrucial to both infrastructure projects that are being delivered and projects yet to be procured.For projects where construction is underway, there needs to be documentation of cost and scheduling impacts, which would then support a partnering approach with the authorities.For infrastructure projects that are yet to be procured, government authorities are encouraged to consider how these risks can be mitigated.

The following upward pressure on infrastructure market costs and tender prices may result if there is no clarity on contractual protection or relief to these new risks:


• Labor Productivity Loss – New workplacedistancingand safety protocolsmay lead to reduced efficiency and productivity.